1 Project
Name:
Model Approval of Measuring Instruments (Prototype Testing)
2 Legal basis
(1) Article 13 of Metrology Law of The People's Republic
of China: When an enterprise or institution manufacturing
measuring instruments undertakes to manufacture new types
of measuring instruments which it has not previously manufactured,
such measuring instruments may be put into production only
after the metrological performance of the sample products
has been checked and found to be qualified by the metrological
administrative department of a people's government at or above
the provincial level.
(2) Article 18 of Rules for the Implementation of The Metrology
Law of the People's Republic of China: The product design
of a new measurement instrument, which has never been produced
in the country, must be appraised before it can be manufactured.
When the product design has been finalized, it is necessary
to go through formalities of model approval and obtain the
relevant certificate. New products whose designs have been
finalized in the country but have never been produced by the
producer must be tested and their prototypes be made. A certificate
of quality shall be issued after the test of prototype is
passed. Those measurement instruments which have not obtained
model approval or certificates of quality of their prototypes
shall not be allowed to be produced.
3 Conditions for Approval
General conclusion of prototype model appraisement (prototype
testing) is qualified and requirements of model appraisement
(prototype testing) are met.
4 Implementing Organization
All new measuring instruments manufactured by domestic enterprises
or institutions shall apply for model approval or prototype
testing to Shanghai Bureau of Quality and Technical Supervision
before put into production.
5 Procedure
(1) Applicant shall submit application and relevant materials
to Shanghai Bureau of Quality and Technical Supervision.
(2) Shanghai Bureau of Quality and Technical Supervision shall
inform the applicant to supplement and/or modify all materials
immediately or within 5 days in case of the application materials
being incomplete or not in accordance with legal form.
(3) Shanghai Bureau of Quality and Technical Supervision shall
determine the technical agency to conduct product design appraisement
(prototype testing) and inform the applicant. Design appraisement
shall be conducted in accordance with the requirements laid
down in the appraisement (prototype testing) outline which
is drawn up by the technical agency responsible for the appraisement
(prototype testing) according to the technical specifications
of design appraisement issued by the metrology administrative
department under the State Council. Design appraisement (prototype
testing) shall be finished within 60 working days in general
conditions. The report of the design appraisement (notice
on prototype testing results) shall be reported by the technical
agency responsible for the appraisement to Shanghai Bureau
of Quality and Technical Supervision.
(4) The report of the design appraisement (notice on prototype
testing results) shall be examined and verified by Shanghai
Bureau of Quality and Technical Supervision. For the applicant
whose instrument has passed such examination and verification,
a Certificate of Model Approval shall be issued to it by Shanghai
Bureau of Quality and Technical Supervision. For the applicant
whose instrument has failed to pass such examination and verification,
an administrative decision not granting approval shall be
issued to it.
6 Time Limit
(1) Acceptance: Shanghai Bureau of Quality and Technical Supervision
shall finish examining application materials and inform the
applicant whether or not the application is accepted within
5 working days from the date of receiving such materials.
(2) Inspection: Shanghai Bureau of Quality and Technical Supervision
shall determine the technical agency to conduct product design
appraisement (prototype testing) and inform the applicant
within 6 working days from the date of acceptance of application.
The technical agency shall finish design appraisement (prototype
testing) within 60 working days in general conditions and
issue the report of the design appraisement (notice on prototype
testing results).
(3) Verification and Issuing Certificate: The report of the
design appraisement (notice on prototype testing results)
shall be examined and verified by Shanghai Bureau of Quality
and Technical Supervision within 6 working days from the date
of receiving it. In case the instrument of the applicant has
passed such examination and verification, a Certificate of
Model Approval (prototype testing passed) shall be issued
to the applicant by Shanghai Bureau of Quality and Technical
Supervision. In case the applicants instrument has failed
to pass such examination and verification, an administrative
decision not granting approval shall be issued to the applicant.
7 Fee
According to Notice on printing and distributing of metrology
charge standard of General Administration of Quality Supervision,
Inspection and Quarantine, State Planning Commission and Ministry
of finance (Issuance No. 323 (1991) of AQSIQ), the cost fee
of Certificate of Model Approval of domestic measuring instruments
is 10 RMB per certificate and the publication fee shall be
charged according to facts.
8 Materials to be submitted for application:
(1) Documentary evidence demonstrating lawful operations of
applicant (original and duplicate).
(2) Triplicate of application (copies permitted).
(3) Prototype manufactured by the applicant and following
materials:
a Photo of prototypes appearance;
b Product standards (including inspection methods and putting
on records );
c General assembly drawings, the circuit diagram and drawings
of important components and parts;
d Operation manual;
e Testing reports by manufacturing unit or technical agency.
|